GENERAL INFORMATION

KEY ACHIEVEMENTS SO FAR - December 2007

General issues

  • Integrated MIBGAS initiative within the South Gas REM.
  • Continued working on different deliverables set up by the work plan.

Priority I: Interconnection Capacity

  • Completed study on investment needs for 2007-2015 between French and Spanish border.
  • Completed the study on investments until 2011 between Spain and Portugal.
  • Agreed the principles of a harmonized CAM, based on an open subscription, for the French-Spanish new interconnections under construction. Details are being finished by TSOs. The Spanish Ministry will publish a norm to allow the application of the procedure in Spain.  French connection Guyenne 1 capacity will be sold in December 2007. The OSP to allocate the planned capacity of the two French-Spanish interconnections will be made in spring 2008. 
  • Irún/Biriatou common interconnection capacities values identified by TSOs.
  • An Open Season procedure is being developed now by TSOs to identified market needs of future Spanish/French interconnection capacity.

Priority II: Interoperability

  • Created 5 internal working groups among TSOs to solve interoperability difficulties already identified in all infrastructures.
  • Agenda to solve the problems available for all interconnections.
  • Portuguese/Spanish problems already identified too.
  • French and Spanish TSOs have started to apply their agenda to sort out interoperability problems .
  • Some interoperability agreements have been reached with regard to the Larrau interconnection.
  • The Spanish Network Code will be modified to adapt to the CBP of EASEE-gas.

Priority III: Transparency

  • Carried out a consultation with shippers on their views on existent level of transparency.
  • Checked information published by TSOs on their web page. Identified improvement areas.
  • A interconnection status record is to be publish this month to made public the development of the new infrastructures. It will be updated each six months.

Priority V: Hubs

  • Portuguese and Spanish regulators have elaborated a draft document with the General Principles and Organization Model of the MIBGAS.The document has gone throught public consultation. 
  • The regulators, as well, have defined a detail agenda for future work.